Residential Development at Bannow Road, Cabra West, Dublin 7 - Part 8 Planning Consultation

Artist impression of a row of houses with people standing in the front.

Planning and Development Act 2000 (as amended).

Planning and Development Regulations 2001 (as amended) - Part 8.

Applicant: Dublin City Council, Housing and Community Services.

Proposal: Clúid Housing Association on behalf of Dublin City Council have lodged a Part 8 Planning Application for the development of 144 apartments on a 1.16 Ha. site at Bannow Road. The site is bound by Bannow Road to the south and southwest, No’s 74/76 Bannow Road to the northwest, Luas and railway tracks to the north and No. 72 Bannow Road to the south and southeast.

The development consists of the following: 

  • Demolition of the existing single storey industrial building, which has a gross floor area (GFA) of 1,455 sq.m;
  • Construction of a residential development with a total of 144 no. apartments (71 no. 1 beds, 63 no. 2 beds, and 10 no. 3 beds) in two residential buildings (Block A and B); 
  • Block A is part 3 to part 6 storeys in height and includes 40 no. apartments (18 no. 1 beds, 21 no. 2 beds and 1 no. 3 bed). Balconies and terraces are provided on all elevations;
  • Block B is part 3 to part 6 storeys in height and includes 104 no. units (53 no. 1 beds, 42 no. 2 beds and 9 no. 3 beds). Balconies and terraces are provided on all elevations;
  • Provision of residential courtyards at ground level to serve the apartments;
  • 25 no. car parking spaces to serve the apartments, 4 no. car share spaces and 3 no. drop-off / loading bay spaces;
  • 227 no. long stay and 72 no. short stay bicycle parking spaces to serve the apartments;
  • Provision of 420 sq.m of community/cultural floorspace in Block A (380 sq.m internal space at ground floor level and 40 sq.m of associated external area);
  • Provision of 78 sq.m of community floorspace at ground floor level of Block B;
  • Provision of 2 no. long stay and 6 no. short stay bicycle spaces to serve the community/cultural uses;
  • Provision of public open space including central area of public open space and public realm improvements;
  • Boundary treatments, public lighting, site drainage works, green roofs, PV panels, internal road surfacing and footpaths, ESB meter rooms, ESB substation, utility and services connections, bin and cycle storage, plant rooms, landscaping and levelling of ground reserved for proposed Luas extension / operations; and
  • All associated development.

Any other information

The proposal has undergone Appropriate Assessment Screening in accordance with Article 6(3) of the Habitats Directive (92/43/EEC) and screening for Environmental Impact Assessment under the EIA Directive 2011/92/EU, as amended by Directive 2014/52/EU. 

In accordance with Article 81 of the Planning & Development Regulations 2001, as amended, the Planning Authority has made a determination and concluded that: 

(a)    The proposed development, either individually or in combination with other plans and projects, is not likely to have a significant effect on any European site(s) and therefore a Stage 2 Appropriate Assessment is not required.

(b)    There is no real likelihood of significant effects on the environment arising from the proposed development and that the proposed development is not of a class set out under Schedule 5 of the Planning and Development Regulations 2001, as amended, and therefore does not require an Environmental Impact Assessment Report (EIAR).

Phases

Phases overview
Accessible plans and documents
Plans and documents
Make a Submission

Accessible plans and documents

30 August 2025

Check out fully accessible versions of the plans and documents related to this project.