Dublin District Heating Project Part 8
Applicant: Dublin City Council (Climate and Urban Resilience Department).
Location: Dublin Waste to Energy Facility, Poolbeg Peninsula, Dublin 4; Boiler Station, Park Lane, Spencer Dock, Dublin 2, River Dodder between York Road Dublin 4 and Sir John Rogerson’s Quay Dublin 2, to provide for district heating distribution network to the North and South Docklands area and the Poolbeg Peninsula at South Bank Road, Irish Glass Bottle development, Seán Moore Road, Bremen Road, Bremen Avenue, Irishtown Sports Stadium, Ringsend Park, Cambridge Road, York Road, Tom Clarke Bridge southern approach road (R131), a tunnelled crossing under the River Dodder, Sir John Rogerson’s Quay, Hanover Quay, Forbes Street, Blood Stoney Street, Britain Quay, Benson Street, Grand Canal Quay, Ringsend Road, North Wall Quay, Customs House Quay, Park Lane, Spencer Place, Abercorn Road, New Wapping Street, Castleforbes Road, Mayor Street Upper, East Wall Road, Dublin 1, 2 and 4.
Iarratasóir: Comhairle Cathrach Bhaile Átha Cliath (An Roinn Aeráide agus Athléimneachta Uirbí).
Suíomh: Fóntas Bhaile Átha Cliath Dramhaíl go Fuinneamh, Leithinis an Phoill Bhig, Baile Átha Cliath 4; Stáisiún Coire, Lána na Páirce, Duga Spencer, Baile Átha Cliath 2; Abhainn na Dothra idir Bóthar Eabhrac, Baile Átha Cliath 4, agus Cé Sir John Rogerson, Baile Átha Cliath 2, chun líonra dáileacháin téimh ceantair a sholáthar do limistéar na nDugthailte Thuaidh agus Theas agus do Leithinis an Phoill Bhig ag Bóthar an Bhruaigh Theas, forbairt Irish Glass Bottle, Bóthar Sheáin Uí Mhórdha, Bóthar Bremen, Ascaill Bremen, Staid Spóirt an Bhaile Ghaelaigh, Páirc an Rinn, Bóthar Cambridge, Bóthar Eabhrac, an bóthar isteach ó dheas chuig Droichead Thomáis Uí Chléirigh (R131), trasnú tolláin faoi Abhainn na Dothra, Cé Sir John Rogerson, Cé Hanover, Sráid Forbes, Sráid Blood Stoney, Cé na Breataine, Sráid Benson, Cé na Canálach Móire, Bóthar an Rinn, Cé an Phoirt Thuaidh, Cé Theach an Chustaim, Lána na Páirce, Plás Spencer, Bóthar Abercorn, Sráid Wapping Nua, Bóthar Castleforbes, Sráid an Mhéara Uachtarach, Bóthar an Phoirt Thoir, Baile Átha Cliath 1, 2 agus 4.
Togra: De bhun na gceanglas thuas, tugtar fógra leis seo maidir le togra Chomhairle Cathrach Bhaile Átha Cliath an chéim thosaigh de Thionscadal Téimh Ceantair Bhaile Átha Cliath a thógáil ag Fóntas Bhaile Átha Cliath Dramhaíl go Fuinneamh, Leithinis an Phoill Bhig, Baile Átha Cliath 4; ag Stáisiún Coire, Lána na Páirce, Duga Spencer, Baile Átha Cliath 1; agus ag trasnú tolláin atá beartaithe ag Abhainn na Dothra, idir Bóthar Eabhrac, Baile Átha Cliath 4, agus Cé Sir John Rogerson, Baile Átha Cliath 2, chun líonra dáileacháin téimh ceantair a sholáthar do na Dugthailte Thuaidh, na Dugthailte Theas agus Leithinis an Phoill Bhig, Baile Átha Cliath 1, 2 agus 4, i ngaireacht do Dhéanmhais Chosanta, ar láithreán arb é 2.88 ha a achar iomlán.
Beidh na gnéithe seo a leanas i gceist le tógáil Chéim Tosaigh Thionscadal Téimh Ceantair Bhaile Átha Cliath:
- Mionathruithe ar an Seomra Gléasra atá ann cheana in Áis Dramhaíl go Fuinneamh Bhaile Átha Cliath: Déanfar mionathruithe in Áis Dramhaíl go Fuinneamh Bhaile Átha Cliath chun gur féidir leas a bhaint as an bhfuinneamh teasa atá ar fáil ón ngléasra. Is éard a bheidh i gceist leis seo gléasra, píobánra agus trealamh a shuiteáil laistigh den Seomra Gléasra Téimh Ceantair atá ann cheana agus atá ceadaithe.
- Droichead Píopaí Cruach Ardaithe atá Beartaithe: Droichead píopaí cruach ardaithe atá beartaithe, a thrasnóidh bóthar inmheánach laistigh de láithreán Áis Dramhaíl go Fuinneamh Bhaile Átha Cliath, a bheidh thart ar 15 m ar fad agus a mbeidh glanspás thart ar 5.5 m os cionn an bhóthair aige, chun tacú le ceithre phíblíne téimh ceantair a nascfaidh leis an líonra téimh ceantair.
- Líonra Píblínte Téimh Ceantair: Suiteálfar thart ar 150m den líonra téimh ceantair os cionn talún, laistigh de shuíomh Shaoráid Dramhaíl go Fuinneamh Bhaile Átha Cliath agus ó dheas uaidh.
- Tollán Abhainn na Dothra atá Beartaithe: Tollán thart ar 140 m ar fad a shíneoidh ó shuíomh in aice le Bóthar Eabhrac san oirthear go Cé Sir John Rogerson san iarthar. Beidh trastomhas inmheánach thart ar 2.5 m sa tollán. Beidh sé thart ar 15 m ar doimhneacht agus beidh clúdach íosta thart ar 6 m os a chionn faoi ghrinneall na habhann. Beidh dhá phíblíne téimh ceantair, duchtáil, comhlaí leithlisithe agus córais choimhdeacha sa tollán, lena n-áirítear monatóireacht ar leibhéal an uisce, caidéil draenála, soilsiú agus aeráil. Áireofar ar na gnéithe os cionn talún a bhaineann leis an tollán seaftaí cigireachta agus cothabhála faoi chlúdach, agus pointí rochtana ar leibhéal na talún, cioscaí rialaithe, cioscaí cumhachta agus aonaid aerála ar dhá thaobh Abhainn na Dothra.
- Mionathruithe ar an Stáisiún Coirí Cúltaca atá ann cheana ag Lána na Páirce, Duga Spencer: Déanfar mionathruithe ar an Stáisiún Coirí Cúltaca atá ann cheana chun a acmhainn a mhéadú ó thart ar 7.2 MWth go thart ar 9 MWth. Áireofar leis na mionathruithe sin uasghrádú, suiteáil agus athchumrú an phíobánra, an ghléasra agus an trealaimh i leagan amach inmheánach an stáisiúin.
Áireofar sa tionscadal freisin Líonra Píblínte Téimh Ceantair a shuiteáil, a mbeidh na nithe seo a leanas ann:
- thart ar 8.5 km de phíblínte comhthreomhara inslithe, sreafa agus fillte, do théamh ceantair, a bheidh curtha faoin talamh agus a mbeidh clúdach íosta 750 mm os a gcionn.
- thart ar 240 m de phíblínte comhthreomhara inslithe téimh ceantair chun uisce téimh ceantair a chur i gcúrsaíocht idir Áis Dramhaíl go Fuinneamh Bhaile Átha Cliath agus umar stórála teasa atá beartaithe don todhchaí agus a bheidh faoi réir iarratas pleanála amach anseo.
- Áireofar an méid seo a leanas leis an mbonneagar coimhdeach líonra:
- lúba fairsingithe faoi thalamh, córais faireachais shreangaithe, comhlaí leithlisithe agus duchtanna chun cáblaí snáthoptaice a iompar chun monatóireacht agus rialú a dhéanamh ar an líonra ina iomláine.
- caibinéid oibríochta agus chothabhála agus mionphiléir leictreacha os cionn talún (600 mm × 370 mm ar leithead × 210 mm ar doimhneacht) ag eatraimh thart ar 500 m feadh an líonra.
- Úsáidfear modhanna trinse oscailte go ginearálta chun an líonra téimh ceantair a thógáil. Mar sin féin, beidh trasrianta gan trinse faoi fhóntais agus seirbhísí éagsúla, lena n-áirítear trasnú an Iarbhalla Farraige / Shéarach an Rinn agus Pheambróg, atá ar Thaifead na nDéanmhas Cosanta, Uimh. Thag. 6797.
Áireofar san fhorbairt an gléasra gaolmhar uile, stóráil dramhaíola, tírdhreachú, cóireálacha teorann, soilsiú agus na hoibreacha coimhdeacha láithreáin agus forbartha uile is gá chun an togra a éascú. Tá an togra tar éis dul faoi Scagadh le haghaidh Measúnacht Chuí i gcomhréir le hAirteagal 6(3) den Treoir maidir le Gnáthóga (92/43/CEE) agus faoi scagadh le haghaidh Measúnacht Tionchair Timpeallachta de réir Threoir 2011/92/AE maidir le MTT, arna leasú le Treoir 2014/52/AE.
I gcomhréir le hAirteagal 81 de na Rialacháin um Pleanáil agus Forbairt, 2001, arna leasú, tá cinneadh déanta ag an Údarás Pleanála agus tháinig sé ar an gconclúid seo a leanas:
(a) Ní dócha go mbeidh éifeacht shuntasach ag an bhforbairt bheartaithe, ina haonar nó in éineacht le pleananna agus tionscadail eile, ar aon láithreán nó láithreáin Eorpacha agus, dá bhrí sin, ní gá Measúnacht Chuí Chéim 2 a dhéanamh.
(b) Níl aon dóchúlacht réadúil ann go n-eascróidh éifeachtaí suntasacha ar an gcomhshaol as an bhforbairt atá beartaithe, agus níl an fhorbairt atá beartaithe d’aicme a leagtar amach faoi Sceideal 5 de na Rialacháin um Pleanáil agus Forbairt, 2001, arna leasú, agus, dá bhrí sin, ní gá Tuarascáil ar Mheasúnacht Tionchair Timpeallachta (TMTT) a ullmhú ina leith.
Féadfaidh duine ar bith, laistigh de 4 seachtaine ó dháta foilsithe an fhógra seo, iarratas a dhéanamh chuig an gCoimisiún Pleanála ar chinneadh scagtha maidir le cé acu is dócha nó nach dócha go mbeadh éifeachtaí suntasacha ag an bhforbairt ar an gcomhshaol.
Féadfar pleananna agus sonraí na forbartha atá beartaithe a iniúchadh nó a cheannach ar tháille nach mó ná an costas réasúnach a bhaineann le cóip a dhéanamh, ar feadh tréimhse 4 seachtaine ón 09/09/2026 le linn gnáthuaireanta oscailte don phobal in oifigí Chomhairle Cathrach Bhaile Átha Cliath, an Cuntar Poiblí, an Roinn Pleanála agus Forbartha Maoine, Bloc 4, Urlár na Talún, Oifigí na Cathrach, an Ché Adhmaid, Baile Átha Cliath 8, ó Luan go hAoine, 9.00 r.n. go 4.30 i.n. (agus in áit eile más infheidhme). Tá na pleananna agus na sonraí ar fáil lena n-iniúchadh ar líne freisin ag https://engage.dublincity.ie/en-IE/projects/ddhp-part-8 ar shuíomh gréasáin na Comhairle Cathrach www.dublincity.ie
Féadfar aighneacht nó tuairim a dhéanamh i scríbhinn maidir leis an bhforbairt atá beartaithe, ina bpléifear pleanáil chuí agus forbairt inbhuanaithe an limistéir ina mbeidh an fhorbairt suite, agus í a sheoladh chuig an mBainisteoir Feidhmiúcháin, an Roinn Pleanála agus Forbartha Maoine, Comhairle Cathrach Bhaile Átha Cliath, Oifigí na Cathrach, an Ché Adhmaid, Baile Átha Cliath 8, roimh 4.30i.n. an 21/10/2026.
Féadfar aighneachtaí nó tuairimí a dhéanamh ar líne freisin https://engage.dublincity.ie/en-IE/projects/ddhp-part-8 ar shuíomh gréasáin na Comhairle Cathrach www.dublincity.ie roimh 23.59 an 21/10/2026.

Céimeanna
Make an observation
Plans and Particulars of the proposed development may be inspected or purchased at a fee not exceeding the reasonable cost of making a copy for a period of 4 weeks from 9th September 2026, during public opening hours at the offices of Dublin City Council, Public Counter, Planning, Property & Economic Development Department, Block 4, Ground Floor, Civic Offices, Wood Quay, Dublin 8, Monday - Friday 9.00am to 4.30pm (and other location if applicable). The plans and particulars are also available for inspection online: https://engage.dublincity.ie and on the City Council’s website www.dublincity.ie.
Plans and Particulars of the proposed development may also be inspected at the CHQ Building, Custom House Quay, North Wall, Dublin 1, D01 KF84. The viewing space can be accessed from the riverside entrance area, adjacent to the revolving doors from Monday-Sunday 7.00am-7.00pm. Plans and particulars may only be inspected at this location.
A submission or observation in relation to the proposed development, dealing with the proper planning and sustainable development of the area in which the development would be situated, may be made, in writing, to the Executive Manager (Environment), Climate and Urban Resilience Department, Dublin City Council, Civic Offices, Wood Quay, Dublin 8, before 4.30pm on 21st October 2026.
Submissions or observations may also be made online on Dublin City Council Engage platform - https://engage.dublincity.ie or on the City Council’s website www.dublincity.ie before 23.59hrs on 21st October 2026. Those making submissions must provide a valid name and postal address (an Eircode is sufficient) as specified under Article 29 of the Planning and Development Regulations 2001. This information will not be published, however it is required for planning feedback to be entered into public record.
Information sessions will be held at the following locations:
- Wednesday 23rd September, 12-2pm, and 6-8pm, Liffey Hall at the Ringsend & Irishtown Community Centre (RICC), Thorncastle Street, D04 P4F3
- Monday 28th September, 12-2pm, and 6-8pm, Dublin Docklands Office, Custom House Quay, Docklands, Dublin 1, D01 KF84
- Thursday 1st October at 12-2pm, and 6-8pm in Irishtown Stadium, Seapoint Terrace, Strand Street, Dublin 4 D04KN77.
To view the Plans and Particulars, please click the following link:

